Skip Navigation
PowerCampus Logo Close Window

2022 Spring 15 Wks
CONT115/Laboratory/M01 - Construction Estimating and Planning | Credits 2.00
This is a study of construction cost estimating and planning, consisting of quantity take-off, material and labor costs and project planning. Emphasis is placed on interpreting architectural and engineering plans and specifications. Prerequisites: CONT 107; DRAF 117; MATH 095 if required by placement testing; ENGL 099 or prior completion or concurrent enrollment in ESL 120, 121, and 122 (or prior completion of ESL 103) if required by placement testing; prior completion or concurrent enrollment in RDNG 116 if required by placement testing. 2 Cr. (1 Lec., 2 Lab.) Spring semester.

    Teaching Mode:  On-Campus Meetings



Registration Type Traditional
Fees N/A
Instructors Anderson, Craig W
Duration 1/26/2022 - 5/20/2022
Schedule WR  4:30 PM - 5:45 PM;  TCCC/Main-Dryden, Main, Room TBA
Credit Types Audit Credit Contract Dual Credit Equiv. Credit Global Connections Sr Audit Tech Prep X-Enroll
Class 24 Seats | 22 Remaining

Primary population and other student populations allowed to register for this course:
 Primary Population# Others Allowed# Others Registered
Campus  Tompkins Cortland Community College240
Program  Under Grad240
College  Math/Eng./Tech./Sci.240
Department  Cont Tech240
Class Level  First Year241
Population  General240